The Oakleaf Group have provided a variety of specialist surveying to St Andrews Health Care over a five year period. St Andrews Health Care is based at St Andrews Hospital in central Northampton with several 'satellite sites' around the country. Working to the Estate Team's specification Oakleaf have surveyed the entire of the Northampton estate to provide accurate 5 Year maintenance plans to tie in with planned ward refurbishment.
Read MoreCommercial Clients
With excessive annual energy consumption from one of their newest and most highly specified buildings, The Lowther Building, St Andrew’s Healthcare commissioned The Oakleaf Group to carry out an energy survey to indentify the sources and causes of this extreme energy usage.
Read MoreThe Oakleaf Group were contracted to survey the entire Craegmoor Health Care estate over a six month period between December 2009 and May 2010. Following the successful completion of the stock condition surveys Oakleaf were commission to carry out further pre-acquisition and measured surveys as part of Craegmoors’ drive for growth.
Read MoreOakleaf were contracted by Castle Fire to undertake a Fire Risk Assessment, focusing on commercial risk, of the Fiddlers Ferry Power Station Flue Gas Desulphurisation (FGD) and the Biomass Plant. The contract was awarded in two phases with Oakleaf reappointed to assess the Biomass Plant following the successful completion of the FGD audits.
Read MoreThe Royal London Group were looking for a specialist firm to undertake a review of their statutory compliance and maintenance liabilities across their extensive estate, with particular focus on their Wilmslow and Edinburgh property portfolios, and approached Oakleaf to submit a fee bid proposal. Following consultation and interviews, Oakleaf were appointed in December 2010 to carry out the reviews.
Read MoreOakleaf's team of specialist Legionella Risk Assessors have undertaken Legionella risk assessments through the substantial Perkins site in Peterborough, Cambridgeshire.
Read MoreThe Oakleaf Group were contracted to survey the external elevations and roofs of the London Trocadero ahead of a significant refurbishment scheme. The elevations comprise several historic listed elements with the Lyon’s Corner House and extensions a particular highlight being clad in faience glazed tiles with numerous decorative freizes, cornices and original steel window frames.
Read MoreThe Oakleaf Group’s ability to deal with complex multi faceted projects was again proven with a detailed series of surveys carried out at 101-104 Piccadilly, London, the current location of the Embassy of Japan. Liaising closely with both Kajima, Kajima FM and the Embassy of Japan’s key staff Oakleaf we able to survey the building with minimum disruption to Embassy Staff and deliver the final reports both on time and to meet the Embassy’s strict requirements.
Read More
Coca Cola Enterprises Ltd Featured
The Oakleaf Group were contracted by Coca-Cola to advise on the maintenance and statutory liabilities at the historic Malvern Water plant in Herefordshire. Liaising directly with the onsite maintenance team, to ensure that the surveys were undertaken outside of manufacturing periods both out of hours and on shut down days, Oakleaf were able to maximise onsite productivity whilst minimising disruption to the plant.
Read More